An expansion joint lets one part of an industrial roof move independently of its neighbour, so the waterproofing is not torn apart when the building expands, contracts or settles. It is also one of the most common places for a roof to leak. A joint that is designed, detailed and maintained properly protects the whole membrane. One that is treated as an afterthought undoes the work done on the rest of the roof. If you own or manage a factory, warehouse or commercial building in Gauteng or the Western Cape, getting this detail right is a job for an experienced contractor, and we connect you with vetted waterproofing professionals through a quote request.
TL;DR
- Expansion joints are structural gaps that absorb movement from temperature, moisture and settlement. The roof waterproofing has to cross them without splitting.
- Joints in the roof must sit exactly above the building’s structural joints and run across the full width of the roof.
- The usual approach is a raised joint, about 200 mm above the roof surface, with the membrane flashed up and over it. Flat joints in the plane of the membrane are the weak point.
- Most leaks come from poor design, undersized or oversized joints, bad flashing and missing inspections.
- Check joints at least once a year and after severe weather, and keep the installing contractor involved in maintenance.
Table of Contents
- What an expansion joint does on an industrial roof
- Why joints are where industrial roofs leak
- Where expansion joints must go
- Types of joint and how they connect to the membrane
- Selecting and detailing a joint for your roof
- Installation mistakes that cause leaks
- Inspection and maintenance
- Joint waterproofing beyond the roof
- Getting your roof joints done properly
- Our view on roof joints
- FAQ
- Sources
What an expansion joint does on an industrial roof
Buildings are never still. Steel and concrete grow in the heat and shrink in the cold, and different parts of a large structure settle at different rates. An expansion joint is a deliberate separation between two building elements, designed to allow free movement along the joint, across it and vertically.
The Canadian Roofing Contractors Association (CRCA) describes these as structural joints that control stresses from changes in dimension, caused by temperature and sometimes moisture. They run through the whole structure from foundation to roof, and the structural engineer decides where they go and how wide they open.
That last point matters for owners. The roof joint is not a separate decision made by the roofer. It continues a joint that already exists in the structure below. The National Roofing Contractors Association (NRCA), the US trade body, says roof joints are there to reduce stress on the building’s components and to stop that stress splitting or ridging the membrane. It also says they must sit at the same location as the structural joints.
How much movement are we talking about?
A 1997 paper published by IIBEC (the International Institute of Building Enclosure Consultants) says that a roof joint must accommodate movement in horizontal, vertical and shear directions while staying waterproof for the life of the roof. It also notes that contraction and expansion of a building is usually limited to a maximum of about 50 mm before damage to the structure and its finishes can result.
On a long industrial roof this adds up. A roof of 60 m or more with a dark membrane in direct sun has a lot of material to expand, and in South Africa that means strong summer heat on the Highveld and in the Cape interior, followed by cooler nights. The joint turns that movement into a gap that opens and closes, and the waterproofing has to survive thousands of those cycles.
Why joints are where industrial roofs leak
A continuous membrane is a simple thing to keep watertight. A joint breaks that continuity by design. IIBEC reports that expansion joints in roof assemblies are a leading cause of water infiltration and leakage, often because they are overlooked in design and treated as an afterthought.
The usual failure routes are these:
- Flashing that stretches and tears. The CRCA’s Roof Joints bulletin explains that repeated thermal loading stretches the flashing until it fails and leaks. It also rejects the idea that a stretchy cover material relieves stress on the membrane.
- Membrane that shrinks or migrates. The same bulletin says poor adhesion lets the membrane shrink and open the joint, and that diagonal stresses from membrane movement can rupture flashings where the roof meets adjoining walls.
- Roof splitting at changes in structure. The bulletin records splits at changes in span direction, at junctions between different deck types, where building wings meet, and over the ends of simply supported beams.
- Water trapped behind the joint. A raised curb can dam the flow of water, which then forces owners to add scuppers (openings through the upstand) to reach drains on the other side. IIBEC notes this as a common consequence of poor planning.
For an industrial owner the consequence is rarely just a drip. Water finds its way into insulation, stock, electrical systems and the ceiling below, and wet insulation can stay hidden for a long time. If you want to understand how these leaks show up inside a building, our guides to common roof issues and to finding the source of roof leaks are a good place to start.
Where expansion joints must go
Placement is set at design stage, but an owner or building manager should know the pattern, because it explains why some roofs leak in the same spots again and again. The NRCA lists locations where a roof joint is needed:
- wherever the structure already has an expansion or contraction joint
- where steel framing, structural steel or decking changes direction
- where separate wings of an L, U or T-shaped building meet
- where the type of decking changes, for example precast concrete abutting steel deck
Roofing Contractor magazine adds building additions, canopies, and places where the interior heating changes, such as a heated office next to an unheated warehouse. It describes a minimum separation of 25 mm continuing through the entire building.
Johns Manville’s re-roofing guide, aimed at inspectors, lists the same trouble spots to examine for membrane splits: over building joints, along lines where a building was extended, where concrete meets steel deck, at the smaller dimension of L, T or U offsets, and on roof expanses longer than about 60 m.
Two rules apply wherever a joint goes in:
- It crosses the whole roof. Per the NRCA, joints must extend across the full width of the roof and never stop short of the edge or perimeter. A joint that ends early forces the membrane to take the movement instead.
- It is not a drain. The NRCA says water drainage should never be attempted through or over an expansion joint. Drainage openings in the joint create gaps in the membrane.
Types of joint and how they connect to the membrane
There are two broad ways of dealing with a roof joint: a raised detail and a flush, factory-made system.
Raised curb joints
This is the traditional method that IIBEC describes: the joint is lifted above the roof plane, the membrane is flashed up each side and the top is capped with metal flashing. The CRCA manual says these joints are typically built from wood planking and cant strips, and must rise at least 200 mm (8 in) above the finished roof surface. Further points from the same manual:
- the two sides must never be fastened together, so each can move on its own
- the tops are cut at an angle so water drains off positively
- the compressible insulation between the two sides must return to its original shape after repeated opening and closing
The NRCA also gives a raised height of 8 in (200 mm) and states that joints should be designed to handle contraction as well as expansion.
Flush, heat-welded systems
Some manufacturers supply joint systems that sit closer to the roof and weld into single-ply membranes. Sika’s technical bulletin on one such system describes a double-level flange: the lower flange is hot-air welded to the membrane beside the joint opening, a termination bar and anchors lock it to the deck, and the upper flange covers the bar so the fixings are sealed. The bulletin stresses that continuity of the seal is critical to performance.
This suits PVC, TPO and EPDM membranes, which are the single-ply systems common on large industrial roofs. If your building has one of these, see our overview of membrane roof waterproofing.
Small movements versus large ones
BMI’s installation instructions for its Wolfin membrane draw a useful line. For small, slow or rare movements, up to about 15 mm vertically or 20 mm parallel to the joint, the waterproofing layer can be laid loosely across the joint. Larger or quick, repetitive movements need a joint raised out of the water-carrying level, using insulating wedges or upstands. The same document advises that these larger joints are planned individually for each building and adapted to local conditions.
That is the important takeaway for an owner: a large industrial roof is not a place for an off-the-shelf detail copied from another building.
Selecting and detailing a joint for your roof
When a contractor quotes on an industrial roof, these are the questions the detail should answer.
Is the joint sized for the real movement? EMSEAL’s guide specification says extrusion size should be coordinated between the manufacturer, designer and contractors, based on expected structural movement and temperature variation, taking into account the as-built gap and the temperature at installation. Nystrom’s 2025 guide names undersized joints, which cannot take the full movement, and oversized joints, which weaken the seal, as leading causes of failure.
Does it line up with the structure? The joint in the roof must sit over the structural joint. In fire-rated construction, the North Carolina State roofing criteria also call for fire-safing material and wood blocking 8 in above the finished roof. Those criteria add that low-profile joints in the plane of the membrane are not recommended because of foot traffic. In South African industrial buildings, check the local fire and building requirements with your engineer.
Is the flashing continuous? Every change of direction, every wall junction and every parapet needs a watertight transition. The NRCA, CRCA and the manufacturers agree that the membrane has to be flashed in a way that accommodates the movement and that only materials specified for that movement are used. The CRCA places this responsibility on the roofer.
Where does the water go? A raised joint can act as a dam across a roof. The drainage layout should be planned with the joint, not after it. Water should be directed to drains on each side rather than through the joint.
Who is responsible for the design? For anything beyond a simple detail, expect an engineer or a manufacturer’s technical department to give a building-specific design, and expect the contractor to follow it.

A worked example
Imagine a distribution warehouse in Johannesburg with a steel-deck main hall and a concrete-deck office block along one side. The change of deck type means the two parts move differently. The structural engineer places a joint along the line where they meet. The roof then needs a raised joint along the same line, running right across the roof to both edges, with the membrane flashed up each side and a flexible cover on top. The roof drains on each side of the joint should be placed so that water never has to cross it. If a contractor proposes a flat strip of membrane laid over the gap, with a scupper cut through the upstand, that is exactly the pattern the research above identifies as a failure risk.
Installation mistakes that cause leaks
Most joint failures trace back to a short list of errors:
- the roof joint is not aligned with the structural joint
- the joint stops before the roof edge
- the two sides are tied together, so they cannot move independently
- roof-level joints are used where a raised detail is needed. Roofing Contractor’s author warns that roof-level joints, even under elastomeric and thermoplastic membranes, can lead to roof failure
- sealant is applied on the surface only. Steelway’s maintenance manual notes that sealants work when applied between two pieces of metal, not topically
- flashing is stripped or left unsealed at transitions to walls and parapets
None of these is obvious from the ground. They are workmanship details, which is why the quality and experience of the installing contractor matter as much as the material chosen.
Inspection and maintenance
Expansion joints move, so they wear. A routine keeps small defects from becoming leaks.
- Inspect at least once a year. General Membrane’s maintenance manual asks for routine checks at least once a year, plus extra checks after extreme weather such as hail or strong winds. It specifies a yearly check of the watertight integrity of expansion joints, possibly before summer, with repair if needed. In South Africa, a sensible timing is before the rainy season in your region.
- Look at the flashing and covers. The JM guide tells inspectors to look for improperly flashed or stripped joint covers, to check the joints between shop-made metal covers and factory covers with bellows, and to check the flange and bellows for deterioration. It also says to verify watertight transitions at roof edges and parapet walls.
- Walk the whole line. Steelway’s manual says that on larger buildings with longitudinal and transverse joints, inspectors should look for irregularities in a flashing joint and for loose fasteners. It also says that excess sealant that has seeped out should be left in place.
- Keep the installer involved. General Membrane’s manual says correct design, workmanlike installation and periodic maintenance are all necessary, and it advises assigning maintenance to the company that installed the roof, warning that neglect may cause serious damage and legal disputes.
- Record what you find. Dated photographs of each joint make it easier to see change from year to year, and make warranty conversations simpler.
If you notice stains on ceilings below a joint line, or ponding beside a raised joint, treat it as a reason to book an inspection promptly. Our guide to what causes ceiling leaks explains how to read the signs inside the building.
Joint waterproofing beyond the roof
Roof joints are one case of a wider principle. Joints in walls, slabs, basements and podium decks all have to move and stay watertight. If you manage a property with several of these, read why waterproofing expansion joints protects your property and our explanation of what joint waterproofing involves.
Getting your roof joints done properly
An industrial roof joint needs a contractor who understands movement, membranes and drainage together, and who will stand behind the work. Pro Waterproofing focuses on helping property owners and managers hire reliable, qualified waterproofing professionals. Our guidance centres on the questions that matter when you evaluate a contractor: quality, experience, licensing and warranties. We offer waterproofing for residential, commercial and industrial properties, including roof, basement, bathroom, foundation and concrete deck work. A completed quote request on our site connects you with vetted waterproofing professionals.
If you have a roof with joints that leak, or you are planning a new roof or re-roof, request a waterproofing quote and describe the building, the roof type and where the water is getting in.
Our view on roof joints
We see roof joints as the detail that tells you how seriously a contractor takes the whole roof. The membrane across an open area is the easy part. The joint is where design, workmanship and maintenance all have to be right at once.
For industrial owners in Gauteng and the Western Cape, our advice is to ask about the joint before you ask about the price. Ask where it sits relative to the structural joint, how high it is raised, how the flashing will be finished at walls and parapets, and where the water will drain. Ask about the warranty and who will inspect the joints afterwards. These are the questions we encourage every property owner to put to a contractor, and they are the reason we focus on helping you choose a qualified professional.
A roof is only as watertight as its weakest detail. Choosing a contractor with the right experience, licensing and warranty is how you make that detail a strength.
Eben
FAQ
What is an expansion joint on a roof?
It is a deliberate gap between two parts of a building, continued through the roof, that lets each part move without damaging the other. The roof waterproofing is flashed or bridged across the gap so that it stays watertight while the joint opens and closes.
Why do expansion joints leak?
Usually because of how they were designed or finished. IIBEC identifies joints as a leading source of roof leaks, often because they were an afterthought. Typical causes are flashing that stretches and tears, joints that stop short of the roof edge, and drainage openings cut through the joint.
How high should a raised roof expansion joint be?
Both the NRCA and the CRCA give a height of about 200 mm (8 in) above the finished roof surface. The tops should slope so water runs off, and the two sides should not be fastened together. Your engineer and contractor will confirm the detail for your building.
How often should expansion joints be inspected?
At least once a year, ideally before the main rainy season, and again after severe weather such as hail or strong winds. Look at flashing, covers, fasteners and transitions at walls and parapets, and have any defects repaired promptly by the installing contractor.
Sources
- Technical Details: How to Accommodate Differential Movement, Roofing Contractor
- NRCA roofing guidelines on expansion joints
- 3.1.4 Expansion Joints, Area Dividers and Curbs, Canadian Roofing Reference Manual
- Roof Expansion and Control Joints, IIBEC
- Roof Joints, Canadian Roofing Contractors Association
- Re-Roofing guide, Johns Manville
- Roof expansion joint technical bulletin, Sika
- Wolfin installation instructions, BMI
- State of North Carolina roofing criteria
- General Membrane maintenance manual